JIJIGA WATER SUPPLY PROJECT

Somali Region Water Resources Development Bureau, Somali Region

[Sept 2008- June 2010]

The enterprise provided study, design and construction supervision and contract administration services. Jijiga Water Supply project supplied reliable potable water to the towns of Jijiga estimated to be 125,600 populations. The project comprised construction of civil works component and installation of Electro mechanical component including supply of pipes & Fittings.

KEBRE MENGEST WATER SUPPLY PROJECT

Oromia Region Water Resources Development Bureau, Oromia Regional state

[March 2008- June 2009]

The enterprise provided study, design and construction supervision and contract administration services to the project. Kebre Mengest Water Supply project supplied reliable potable water to the towns of Kebre Mengest and Shakisso over all estimated to be143, 115. The project comprised construction of civil works component and installation of Electro mechanical component including supply of pipes & Fittings.

SEMERA & LOGYA WATER SUPPLY PROJECT

Afar Region Water Resources Development Bureau, Afar Region

[Sept 2006- Sept2008]

The enterprise provided study, design and construction supervision and contract administration services to the project. Semera & Logya Water Supply project supplied potable water to a total of 40,000 (25000 & 15000) people living in both cities including the surrounding area. The project comprised construction of civil works component and installation of Electro mechanical component including supply of pipes & Fittings.

FILTU AND HARGELE WATER SUPPLY PROJECT

Somali Region Water Resources Development Bureau, Somali Region

[July 2005- June 2006]

The enterprise provided study, design and construction supervision and contract administration services to the projects. Filtu and Hargele Water Supply project supplied reliable potable water to the towns of Filtu and Hargele from Genale and Weib Rivers respectively for the coming two decades. The projects completed and begun to deliver service a total of over 106,082 populations (71400 & 34682). The project comprised construction of civil works component and installation of Electro mechanical component including supply of pipes & fittings.

DALLOL AREA GROUND WATER ASSESSMENT AND SUPERVISION OF BOREHOLE DRILLING PROJECT

[June 2012 - DATE]

Ministry of Water and Energy, Afar Region

The enterprise undertook groundwater Potential assessment and study supervision of borehole drilling project.

MESKEN, MAREKO AND SILTAE PLAIN GROUNDWATER ASSESMENT PROJECT

[June 2012 -DATE]

Southern Nations Nationalities & Peoples Regional State, Irrigation Development and Scheme Administration Agency, Southern Nation’s National Regional State

The enterprise undertook groundwater Potential assessment Study and Supervision of test and pilot production wells project

FAFEM, JERER SUB BASINS AND THE ADJACENT EASTERN PARTS GROUND WATER POTENTIAL ASSESSMENT STUDY AND SUPERVISION OF TEST AND PILOT PRODUCTION WELLS PROJECT

Ministry of Agriculture, Somali national Regional State

[September 2011-DATE]

The enterprise undertook groundwater Potential assessment Study and Supervision of test and pilot production wells project

TERU GROUND WATER ASSESSMENT PROJECT

Ministry of Water Resources, Regional State Afar

[April 2009]

The enterprise undertook potential of ground water in the area and proposed the potential could be used for irrigation projects.

ADA’A GROUND WATER POTENTIAL ASSESSMENT

Ministry of Water Resources, Regional State Afar

[June 2009]

The Enterprise carried out field survey of the lakes by echo sounder (digital) on top of preparation of one meter contour interval bathymetric map of the lakes for water balance modeling.

WELKITE-AMBO GROUND WATER ASSESSMENT PROJECT

Ministry of Water Resources

[April 2009-October 2011]

Gullele Botanic Garden Masonry Dam Construction Project

Gullele Botanic Garden,Gullele

[2011]

We provided masonry dam supervision with Final Project cost was 12,435,797.67 including 15% VAT.

v Major components of the project:

v Masonry Dam construction.

v Spillway construction of the dam.

v Dam Associated structures.

v Upstream seepage protection trement works.

v Conservation works.

Finoteselam and Jiga Towns Water Supply and Sanitation Construction Supervision

[2006]

Finoteselam and Jiga Towns, Amhara National Regional State, Water Resources Development Bureau

WWDSE undertake construction supervision, contract administration, design modifications, capacity building and business plan review activities.

Addis Ababa Ground Water Study, Design & Construction Supervision

Phase II, Phase III (Part A), Phase III (Part B)

Addis Ababa Water & Sewerage Authority, Addis Ababa

[2008, 2014]

Phase II

Project Component: Study, Design & Construction Supervision

Capacity = 83,000m3/day

Consultancy Project Cost: 22,000,000.00 including VAT

Phase III (Part A)

Capacity: 70,000m3/day

Consultancy Project Cost: Including VAT 20,000,000

Phase III (Part B)

Consultancy Project Cost: 24,000,000 including VAT

Ribb Dam Construction Supervision

Ministry of Water and Energy, Amhara Regional State

Project Description

Irrigable land: 20,000ha

Earth –Rock Fill Dam:

Crest length…………………………...800m

Crest Width………………….........…10.0m

Dam height above the river bed level.......…..73.2m

Dam height above general foundation level...83.2m

Reservoir capacity …………….…234Mm3

Water surface area at full reservoir level …..1020ha

Dam crest elevation ……...….1945.5m.a.s.l

Main Dam under Construction

Intake Tower:

Discharging capacity ……..…… 78m3/s

Height (1884.50 – 1955)....…....  64.5m

Side Spillway:

Effective Crest length …….……107m

Type………………………….Ogee weir type

Crest level……….....…………1940m.a.s.l

Design discharge……...………1060m3/s

Kuraz Sugar Development Project

Ethiopia Sugar Corporation, Southern Nation, Nationalities and People Regional State

Project Purpose: Sugar Cane Development

Irrigable land: Gross 254,000ha (Net 150,000ha)

No. of Sugar Factories: 6

Services Being Delivered: Project Study and Detail Design

Main Components of the Project

River Diversion weir

v Coffer Dam and Spill canal

v Spill channel

v Main canal

v Crossing structure

v Connecting Canal

Ada’a and Becho Plains 110 Deep Production Wells Drilling Supervision Project

Ministry of Water & Energy; Oromia Regional State Project objectives

By conducting serious and efficient drilling, construction and pumping test supervision of 110 boreholes, it is anticipated to come up with: Boreholes that penetrate the optimum aquifer thickness (minimize partial penetration of aquifers).

Borehole that can yield sufficient water (good discharge) for irrigation with less than down Boreholes constructed by using -quality construction materials like casings, gravel and observation pipes.

To conduct quality pumping test that can help the calculation of hydraulic parameters like aquifer transmissivity and storage coefficient.

To decide optimum borehole diameter and depth so as to extract water for irrigation with minimal impact on the environment.

To determine discharge that can be extracted from each borehole and to set appropriate criterion for electromechanical equipment.

Megech Dam Construction Project

Ministry of Water and Energy, Amhara Regional State

Irrigable land: 17,000ha

Major Components of the Project are:

Earth –Rock Fill Dam

Crest length………… 890m

Crest Width………… 10.0m

Dam height above general foundation level (1864)--90.10m

Reservoir capacity at maximum level -------------- 185Mm3

Required Irrigation water supply volume--------116 Mm3

Required water supply for Gondar town & satellite cities----32 Mm3

Dead storage volume----------------------------------19 Mm3

Water surface area at full reservoir level---------------- 870ha

Upstream coffer dam

Crest Length ---------------------------- 432m

Crest width ------------------------------7 m

Dam height above the river bed --- 12m

Downstream coffer dam

Crest Length ----------------------------160.00M

Crest width …---------------------------7m

Dam height above the river bed---- 4m

Side Spillway

Crest length -----------------------------54m

Total Length spillway-----------------486.00m

Width of chute-varies----------------from 15m-30m

Type------------------------------------Side spillway with Ogee

Crest level-----------------------------1947.10m.a.m.s.l

Intake Tower

Height ------------------------------------- 64.70m

Discharge capacity ----------------------20m3/s

Irrigation command area -----------------17,000ha